1400 × 900px Wide — the cleared stretch
Field report

Drainage clearing, Ngong Road side

Date
Sunday 14 June 2026
Where
Ngong Road side, Langata

A long stretch of roadside channel, cleared in a single Saturday by the largest crew we have fielded.

1400 × 900px Wide — the cleared stretch

Roadside channels fill faster than anything else and clear slower, because half of what goes in is not litter but silt. It took the full morning and more hands than we expected to need. The stretch held through the next heavy rain, which is the only measure that matters.

#MyEnvironmentMyResponsibility Langata
900 × 1100px Portrait — volunteer mid-work
1100 × 800px Before and after the silt came out

Next / Coming Up

The next one is open too.

See upcoming events