1400 × 900px
Wide — the cleared stretch
Field report
Drainage clearing, Ngong Road side
- Date
- Sunday 14 June 2026
- Where
- Ngong Road side, Langata
A long stretch of roadside channel, cleared in a single Saturday by the largest crew we have fielded.
Roadside channels fill faster than anything else and clear slower, because half of what goes in is not litter but silt. It took the full morning and more hands than we expected to need. The stretch held through the next heavy rain, which is the only measure that matters.